Published:
ENSTOR Announces Open Season for Mississippi Facility
HOUSTON - (BUSINESS WIRE) - ENSTOR is conducting an open season for 1.7 billion cubic feet ("Bcf" )
of firm natural gas storage capacity that is currently subject to a
right of first refusal ("ROFR" ) with a term up to 5 years, beginning
April 1, 2010. The open season will be held in accordance with the
procedures set forth at Section 3 of the General Terms and Conditions of
the FERC Gas Tariff of Caledonia Energy Partners, L.L.C. ("Caledonia" ).
This open season is separate and distinct from the general open season
that was held by ENSTOR between Sept. 16 and Sept. 30, 2009 for firm
storage capacity at each of its operational North American facilities.
ENSTOR will begin accepting binding bids for firm storage capacity at
its Caledonia facility in Lowndes County, Mississippi, beginning Nov.
10, 2009. All bids will be due by 5:00 p.m. CT on Nov. 17, 2009.
Bids may be placed online through the ENSTOR website: www.enstorinc.com.
All bids will be subject to credit approval prior to their submission.
For details, parties interested in bidding should contact Kay Atchison
at kay.atchison@enstorinc.com
or (281) 374-3075.
Caledonia is a high-deliverability, multi-cycle gas storage facility
located in Northeast Mississippi. The facility is connected to Tennessee
Gas Pipeline on its 500 Leg in Zone 1, and is located in an area
traversed by numerous new and existing interstate pipelines which access
the prolific Barnett, Woodford and Haynesville shale production areas.
Additionally, this pipeline serves markets in the Northeast, Southeast
and Ohio Valley regions.
Caledonia is in an excellent location to service electric power
generation and natural gas distribution markets, giving customers access
to firm and interruptible storage opportunities.
Iberdrola Renewables/ENSTOR
Anita Marks, 503-796-6998
Copyright © 2009, Business Wire, Inc., All rights reserved.
Copyright © 2009, NewsBlaze,
Daily News
Tags: Business wire, mississippi, texas